published on Monday, Nov 9, 2026 by Pulumiverse
published on Monday, Nov 9, 2026 by Pulumiverse
Provides a Vercel KMS project grant.
Note: Vercel KMS is currently in beta. Its resources, data sources, and the underlying API may change in backwards-incompatible ways in future releases of the provider.
A project grant authorizes a Vercel project to request signed JWTs from a KMS issuer in the listed environments, optionally with additional token claims.
Example Usage
import * as pulumi from "@pulumi/pulumi";
import * as vercel from "@pulumiverse/vercel";
const example = new vercel.Project("example", {name: "example-project"});
const exampleKmsIssuer = new vercel.KmsIssuer("example", {name: "my-issuer"});
const exampleKmsProjectGrant = new vercel.KmsProjectGrant("example", {
issuerId: exampleKmsIssuer.id,
projectId: example.id,
environments: [
"production",
"preview",
],
tokenClaims: JSON.stringify({
aud: "https://example.com",
}),
});
import pulumi
import json
import pulumiverse_vercel as vercel
example = vercel.Project("example", name="example-project")
example_kms_issuer = vercel.KmsIssuer("example", name="my-issuer")
example_kms_project_grant = vercel.KmsProjectGrant("example",
issuer_id=example_kms_issuer.id,
project_id=example.id,
environments=[
"production",
"preview",
],
token_claims=json.dumps({
"aud": "https://example.com",
}))
package main
import (
"encoding/json"
"github.com/pulumi/pulumi/sdk/v3/go/pulumi"
"github.com/pulumiverse/pulumi-vercel/sdk/v5/go/vercel"
)
func main() {
pulumi.Run(func(ctx *pulumi.Context) error {
example, err := vercel.NewProject(ctx, "example", &vercel.ProjectArgs{
Name: pulumi.String("example-project"),
})
if err != nil {
return err
}
exampleKmsIssuer, err := vercel.NewKmsIssuer(ctx, "example", &vercel.KmsIssuerArgs{
Name: pulumi.String("my-issuer"),
})
if err != nil {
return err
}
tmpJSON0, err := json.Marshal(map[string]interface{}{
"aud": "https://example.com",
})
if err != nil {
return err
}
json0 := string(tmpJSON0)
_, err = vercel.NewKmsProjectGrant(ctx, "example", &vercel.KmsProjectGrantArgs{
IssuerId: exampleKmsIssuer.ID(),
ProjectId: example.ID(),
Environments: pulumi.StringArray{
pulumi.String("production"),
pulumi.String("preview"),
},
TokenClaims: pulumi.String(json0),
})
if err != nil {
return err
}
return nil
})
}
using System.Collections.Generic;
using System.Linq;
using System.Text.Json;
using Pulumi;
using Vercel = Pulumiverse.Vercel;
return await Deployment.RunAsync(() =>
{
var example = new Vercel.Project("example", new()
{
Name = "example-project",
});
var exampleKmsIssuer = new Vercel.KmsIssuer("example", new()
{
Name = "my-issuer",
});
var exampleKmsProjectGrant = new Vercel.KmsProjectGrant("example", new()
{
IssuerId = exampleKmsIssuer.Id,
ProjectId = example.Id,
Environments = new[]
{
"production",
"preview",
},
TokenClaims = JsonSerializer.Serialize(new Dictionary<string, object?>
{
["aud"] = "https://example.com",
}),
});
});
package generated_program;
import com.pulumi.Context;
import com.pulumi.Pulumi;
import com.pulumi.core.Output;
import com.pulumiverse.vercel.Project;
import com.pulumiverse.vercel.ProjectArgs;
import com.pulumiverse.vercel.KmsIssuer;
import com.pulumiverse.vercel.KmsIssuerArgs;
import com.pulumiverse.vercel.KmsProjectGrant;
import com.pulumiverse.vercel.KmsProjectGrantArgs;
import static com.pulumi.codegen.internal.Serialization.*;
import java.util.List;
import java.util.ArrayList;
import java.util.Map;
import java.io.File;
import java.nio.file.Files;
import java.nio.file.Paths;
public class App {
public static void main(String[] args) {
Pulumi.run(App::stack);
}
public static void stack(Context ctx) {
var example = new Project("example", ProjectArgs.builder()
.name("example-project")
.build());
var exampleKmsIssuer = new KmsIssuer("exampleKmsIssuer", KmsIssuerArgs.builder()
.name("my-issuer")
.build());
var exampleKmsProjectGrant = new KmsProjectGrant("exampleKmsProjectGrant", KmsProjectGrantArgs.builder()
.issuerId(exampleKmsIssuer.id())
.projectId(example.id())
.environments(
"production",
"preview")
.tokenClaims(serializeJson(
jsonObject(
jsonProperty("aud", "https://example.com")
)))
.build());
}
}
resources:
example:
type: vercel:Project
properties:
name: example-project
exampleKmsIssuer:
type: vercel:KmsIssuer
name: example
properties:
name: my-issuer
exampleKmsProjectGrant:
type: vercel:KmsProjectGrant
name: example
properties:
issuerId: ${exampleKmsIssuer.id}
projectId: ${example.id}
environments:
- production
- preview
tokenClaims:
fn::toJSON:
aud: https://example.com
Example coming soon!
Create KmsProjectGrant Resource
Resources are created with functions called constructors. To learn more about declaring and configuring resources, see Resources.
Constructor syntax
new KmsProjectGrant(name: string, args: KmsProjectGrantArgs, opts?: CustomResourceOptions);@overload
def KmsProjectGrant(resource_name: str,
args: KmsProjectGrantArgs,
opts: Optional[ResourceOptions] = None)
@overload
def KmsProjectGrant(resource_name: str,
opts: Optional[ResourceOptions] = None,
environments: Optional[Sequence[str]] = None,
issuer_id: Optional[str] = None,
project_id: Optional[str] = None,
team_id: Optional[str] = None,
token_claims: Optional[str] = None)func NewKmsProjectGrant(ctx *Context, name string, args KmsProjectGrantArgs, opts ...ResourceOption) (*KmsProjectGrant, error)public KmsProjectGrant(string name, KmsProjectGrantArgs args, CustomResourceOptions? opts = null)
public KmsProjectGrant(String name, KmsProjectGrantArgs args)
public KmsProjectGrant(String name, KmsProjectGrantArgs args, CustomResourceOptions options)
type: vercel:KmsProjectGrant
properties: # The arguments to resource properties.
options: # Bag of options to control resource's behavior.
resource "vercel_kms_project_grant" "name" {
# resource properties
}Parameters
- name string
- The unique name of the resource.
- args KmsProjectGrantArgs
- The arguments to resource properties.
- opts CustomResourceOptions
- Bag of options to control resource's behavior.
- resource_name str
- The unique name of the resource.
- args KmsProjectGrantArgs
- The arguments to resource properties.
- opts ResourceOptions
- Bag of options to control resource's behavior.
- ctx Context
- Context object for the current deployment.
- name string
- The unique name of the resource.
- args KmsProjectGrantArgs
- The arguments to resource properties.
- opts ResourceOption
- Bag of options to control resource's behavior.
- name string
- The unique name of the resource.
- args KmsProjectGrantArgs
- The arguments to resource properties.
- opts CustomResourceOptions
- Bag of options to control resource's behavior.
- name String
- The unique name of the resource.
- args KmsProjectGrantArgs
- The arguments to resource properties.
- options CustomResourceOptions
- Bag of options to control resource's behavior.
Constructor example
The following reference example uses placeholder values for all input properties.
var kmsProjectGrantResource = new Vercel.KmsProjectGrant("kmsProjectGrantResource", new()
{
Environments = new[]
{
"string",
},
IssuerId = "string",
ProjectId = "string",
TeamId = "string",
TokenClaims = "string",
});
example, err := vercel.NewKmsProjectGrant(ctx, "kmsProjectGrantResource", &vercel.KmsProjectGrantArgs{
Environments: pulumi.StringArray{
pulumi.String("string"),
},
IssuerId: pulumi.String("string"),
ProjectId: pulumi.String("string"),
TeamId: pulumi.String("string"),
TokenClaims: pulumi.String("string"),
})
resource "vercel_kms_project_grant" "kmsProjectGrantResource" {
lifecycle {
create_before_destroy = true
}
environments = ["string"]
issuer_id = "string"
project_id = "string"
team_id = "string"
token_claims = "string"
}
var kmsProjectGrantResource = new KmsProjectGrant("kmsProjectGrantResource", KmsProjectGrantArgs.builder()
.environments("string")
.issuerId("string")
.projectId("string")
.teamId("string")
.tokenClaims("string")
.build());
kms_project_grant_resource = vercel.KmsProjectGrant("kmsProjectGrantResource",
environments=["string"],
issuer_id="string",
project_id="string",
team_id="string",
token_claims="string")
const kmsProjectGrantResource = new vercel.KmsProjectGrant("kmsProjectGrantResource", {
environments: ["string"],
issuerId: "string",
projectId: "string",
teamId: "string",
tokenClaims: "string",
});
type: vercel:KmsProjectGrant
properties:
environments:
- string
issuerId: string
projectId: string
teamId: string
tokenClaims: string
KmsProjectGrant Resource Properties
To learn more about resource properties and how to use them, see Inputs and Outputs in the Architecture and Concepts docs.
Inputs
In Python, inputs that are objects can be passed either as argument classes or as dictionary literals.
The KmsProjectGrant resource accepts the following input properties:
- Environments List<string>
- The environments in which the project may request signed tokens (for example
production,preview). - Issuer
Id string - The ID of the issuer this policy is attached to.
- Project
Id string - The ID of the Vercel project being granted access.
- Team
Id string - The ID of the team the issuer exists under. Required when configuring a team resource if a default team has not been set in the provider.
- Token
Claims string - Additional claims KMS should include in signed JWTs for this policy, as a JSON-encoded object.
- Environments []string
- The environments in which the project may request signed tokens (for example
production,preview). - Issuer
Id string - The ID of the issuer this policy is attached to.
- Project
Id string - The ID of the Vercel project being granted access.
- Team
Id string - The ID of the team the issuer exists under. Required when configuring a team resource if a default team has not been set in the provider.
- Token
Claims string - Additional claims KMS should include in signed JWTs for this policy, as a JSON-encoded object.
- environments list(string)
- The environments in which the project may request signed tokens (for example
production,preview). - issuer_
id string - The ID of the issuer this policy is attached to.
- project_
id string - The ID of the Vercel project being granted access.
- team_
id string - The ID of the team the issuer exists under. Required when configuring a team resource if a default team has not been set in the provider.
- token_
claims string - Additional claims KMS should include in signed JWTs for this policy, as a JSON-encoded object.
- environments List<String>
- The environments in which the project may request signed tokens (for example
production,preview). - issuer
Id String - The ID of the issuer this policy is attached to.
- project
Id String - The ID of the Vercel project being granted access.
- team
Id String - The ID of the team the issuer exists under. Required when configuring a team resource if a default team has not been set in the provider.
- token
Claims String - Additional claims KMS should include in signed JWTs for this policy, as a JSON-encoded object.
- environments string[]
- The environments in which the project may request signed tokens (for example
production,preview). - issuer
Id string - The ID of the issuer this policy is attached to.
- project
Id string - The ID of the Vercel project being granted access.
- team
Id string - The ID of the team the issuer exists under. Required when configuring a team resource if a default team has not been set in the provider.
- token
Claims string - Additional claims KMS should include in signed JWTs for this policy, as a JSON-encoded object.
- environments Sequence[str]
- The environments in which the project may request signed tokens (for example
production,preview). - issuer_
id str - The ID of the issuer this policy is attached to.
- project_
id str - The ID of the Vercel project being granted access.
- team_
id str - The ID of the team the issuer exists under. Required when configuring a team resource if a default team has not been set in the provider.
- token_
claims str - Additional claims KMS should include in signed JWTs for this policy, as a JSON-encoded object.
- environments List<String>
- The environments in which the project may request signed tokens (for example
production,preview). - issuer
Id String - The ID of the issuer this policy is attached to.
- project
Id String - The ID of the Vercel project being granted access.
- team
Id String - The ID of the team the issuer exists under. Required when configuring a team resource if a default team has not been set in the provider.
- token
Claims String - Additional claims KMS should include in signed JWTs for this policy, as a JSON-encoded object.
Outputs
All input properties are implicitly available as output properties. Additionally, the KmsProjectGrant resource produces the following output properties:
- created_
at string - The time the policy was created.
- id string
- The provider-assigned unique ID for this managed resource.
- updated_
at string - The time the policy was last updated.
- created_
at str - The time the policy was created.
- id str
- The provider-assigned unique ID for this managed resource.
- updated_
at str - The time the policy was last updated.
Look up Existing KmsProjectGrant Resource
Get an existing KmsProjectGrant resource’s state with the given name, ID, and optional extra properties used to qualify the lookup.
public static get(name: string, id: Input<ID>, state?: KmsProjectGrantState, opts?: CustomResourceOptions): KmsProjectGrant@staticmethod
def get(resource_name: str,
id: str,
opts: Optional[ResourceOptions] = None,
created_at: Optional[str] = None,
environments: Optional[Sequence[str]] = None,
issuer_id: Optional[str] = None,
project_id: Optional[str] = None,
team_id: Optional[str] = None,
token_claims: Optional[str] = None,
updated_at: Optional[str] = None) -> KmsProjectGrantfunc GetKmsProjectGrant(ctx *Context, name string, id IDInput, state *KmsProjectGrantState, opts ...ResourceOption) (*KmsProjectGrant, error)public static KmsProjectGrant Get(string name, Input<string> id, KmsProjectGrantState? state, CustomResourceOptions? opts = null)public static KmsProjectGrant get(String name, Output<String> id, KmsProjectGrantState state, CustomResourceOptions options)resources: _: type: vercel:KmsProjectGrant get: id: ${id}import {
to = vercel_kms_project_grant.example
id = "${id}"
}
- name
- The unique name of the resulting resource.
- id
- The unique provider ID of the resource to lookup.
- state
- Any extra arguments used during the lookup.
- opts
- A bag of options that control this resource's behavior.
- resource_name
- The unique name of the resulting resource.
- id
- The unique provider ID of the resource to lookup.
- name
- The unique name of the resulting resource.
- id
- The unique provider ID of the resource to lookup.
- state
- Any extra arguments used during the lookup.
- opts
- A bag of options that control this resource's behavior.
- name
- The unique name of the resulting resource.
- id
- The unique provider ID of the resource to lookup.
- state
- Any extra arguments used during the lookup.
- opts
- A bag of options that control this resource's behavior.
- name
- The unique name of the resulting resource.
- id
- The unique provider ID of the resource to lookup.
- state
- Any extra arguments used during the lookup.
- opts
- A bag of options that control this resource's behavior.
- Created
At string - The time the policy was created.
- Environments List<string>
- The environments in which the project may request signed tokens (for example
production,preview). - Issuer
Id string - The ID of the issuer this policy is attached to.
- Project
Id string - The ID of the Vercel project being granted access.
- Team
Id string - The ID of the team the issuer exists under. Required when configuring a team resource if a default team has not been set in the provider.
- Token
Claims string - Additional claims KMS should include in signed JWTs for this policy, as a JSON-encoded object.
- Updated
At string - The time the policy was last updated.
- Created
At string - The time the policy was created.
- Environments []string
- The environments in which the project may request signed tokens (for example
production,preview). - Issuer
Id string - The ID of the issuer this policy is attached to.
- Project
Id string - The ID of the Vercel project being granted access.
- Team
Id string - The ID of the team the issuer exists under. Required when configuring a team resource if a default team has not been set in the provider.
- Token
Claims string - Additional claims KMS should include in signed JWTs for this policy, as a JSON-encoded object.
- Updated
At string - The time the policy was last updated.
- created_
at string - The time the policy was created.
- environments list(string)
- The environments in which the project may request signed tokens (for example
production,preview). - issuer_
id string - The ID of the issuer this policy is attached to.
- project_
id string - The ID of the Vercel project being granted access.
- team_
id string - The ID of the team the issuer exists under. Required when configuring a team resource if a default team has not been set in the provider.
- token_
claims string - Additional claims KMS should include in signed JWTs for this policy, as a JSON-encoded object.
- updated_
at string - The time the policy was last updated.
- created
At String - The time the policy was created.
- environments List<String>
- The environments in which the project may request signed tokens (for example
production,preview). - issuer
Id String - The ID of the issuer this policy is attached to.
- project
Id String - The ID of the Vercel project being granted access.
- team
Id String - The ID of the team the issuer exists under. Required when configuring a team resource if a default team has not been set in the provider.
- token
Claims String - Additional claims KMS should include in signed JWTs for this policy, as a JSON-encoded object.
- updated
At String - The time the policy was last updated.
- created
At string - The time the policy was created.
- environments string[]
- The environments in which the project may request signed tokens (for example
production,preview). - issuer
Id string - The ID of the issuer this policy is attached to.
- project
Id string - The ID of the Vercel project being granted access.
- team
Id string - The ID of the team the issuer exists under. Required when configuring a team resource if a default team has not been set in the provider.
- token
Claims string - Additional claims KMS should include in signed JWTs for this policy, as a JSON-encoded object.
- updated
At string - The time the policy was last updated.
- created_
at str - The time the policy was created.
- environments Sequence[str]
- The environments in which the project may request signed tokens (for example
production,preview). - issuer_
id str - The ID of the issuer this policy is attached to.
- project_
id str - The ID of the Vercel project being granted access.
- team_
id str - The ID of the team the issuer exists under. Required when configuring a team resource if a default team has not been set in the provider.
- token_
claims str - Additional claims KMS should include in signed JWTs for this policy, as a JSON-encoded object.
- updated_
at str - The time the policy was last updated.
- created
At String - The time the policy was created.
- environments List<String>
- The environments in which the project may request signed tokens (for example
production,preview). - issuer
Id String - The ID of the issuer this policy is attached to.
- project
Id String - The ID of the Vercel project being granted access.
- team
Id String - The ID of the team the issuer exists under. Required when configuring a team resource if a default team has not been set in the provider.
- token
Claims String - Additional claims KMS should include in signed JWTs for this policy, as a JSON-encoded object.
- updated
At String - The time the policy was last updated.
Import
The pulumi import command can be used, for example:
If importing into a personal account, or with a team configured on the provider, use the issuer id and project id.
$ pulumi import vercel:index/kmsProjectGrant:KmsProjectGrant example iss_xxxxxxxxxxxxxxxxxxxxxxxxxxxx/prj_xxxxxxxxxxxxxxxxxxxxxxxxxxxx
Alternatively, you can import via the team_id, issuer id and project id.
- team_id can be found in the team
settingstab in the Vercel UI.
$ pulumi import vercel:index/kmsProjectGrant:KmsProjectGrant example team_xxxxxxxxxxxxxxxxxxxxxxxx/iss_xxxxxxxxxxxxxxxxxxxxxxxxxxxx/prj_xxxxxxxxxxxxxxxxxxxxxxxxxxxx
To learn more about importing existing cloud resources, see Importing resources.
Package Details
- Repository
- vercel pulumiverse/pulumi-vercel
- License
- Apache-2.0
- Notes
- This Pulumi package is based on the
vercelTerraform Provider.
published on Monday, Nov 9, 2026 by Pulumiverse